construction
Stacking the rails
Stage sets for the eye
With the loss of tactility, measures and details crafted for the human body – and particularly for the hand – architectural structures become repulsively flat, sharp-edged, immaterial and unreal. The detachment of construction from the realities of matter and craft further turns architecture into stage sets for the eye, into a scenography devoid of the authenticity of matter and construction. The sense of 'aura', the authority of presence, that Walter Benjamin regards as a necessary quality for an authentic piece of art, has been lost.
To build a folly
To build a folly is essentially to do something a second time, something at an inopportune moment. That something is always the memory of something forgotten, about which we can paradoxically say "There it is again."
Follies were misunderstood, purposeless constructions. They were often only small, extravagant gestures in a garden, easily whisking off the imagination to distant lands, a sort of time capsule built to awaken the memory and induce surprise in passers-by. They marked locations, organized secondary paths in a park, or simply predicted the arrival of better times—a demarcation, a sacred spot, a mysterious trail, a hill whose tragic rocky nature begged for a tower, a party, or the arrival of summer.
Errors & Crimes
"A builder who hides any part of the building frame, abandons the only permissible and, at the same time, the most beautiful embellishment of architecture. The one that hides a loadbearing column makes an error. The one who builds a false column commits a crime."
— Auguste Perret
The Timeless Way of Building
A Book by Christopher Alexander- Mind of no mind
- The quality without a name
- An objective matter
- Bitterness
- The most precious thing we ever have
A Pattern Language
- Its place in the web of nature
- 9. Scattered Work
- 21. Four-Story Limit
- 51. Green Streets
- 53. Main Gateways
The Battle for the Life and Beauty of the Earth
A Book by Christopher Alexander- Two generating systems
- Two types of building production
- System A
- System B
- This has harmed modern society greatly
On the "Building" of Software and Websites
An Essay by Dorian TaylorI’m beginning to suspect that software, and more conspicuously the Web, is fundamentally the wrong shape for the archetype of the construction project.
Deadlines are bullshit
In software development deadlines are a necessary evil. It is important to understand when they are necessary, and it is important to understand why they are evil.
- External vs. internal deadlines
- Why are internal deadlines evil?
- Engineers who love their work
External vs. internal deadlines
When are deadlines necessary?
- Contractual obligations
- Technical liabilities (e.g., dependency EOL)
- Compliance, government, investors, and other external stakeholders
What do all of these deadlines have in common? They are all important. They are all deadlines that cannot be missed. They are all external.
When are deadlines evil?
- Your manager says you have a deadline
- Your software development methodology says you have deadlines
What do all of these deadlines have in common? None of them are important. They are arbitrary. They are all internal. They are all bullshit.
Why are internal deadlines evil?
- Estimation: When estimating engineering work a substantial time investment is required by an engineer in order to get an accurate estimate.
- Misaligned Incentives: There is an incentive to lie and give estimates much longer than the feature is truly expected to take.
- Low Morale: Deadlines are likely to be missed often. Repeated failure has a cost to the morale of the team.
- Micromanagement: Deadlines are wielded by middle managers as a whip to harass and annoy engineers working on features.
- High Stress: When engineers feel the pressure of other stakeholders holding deadlines over their heads it creates an environment of high stress.
- High Turnover: On teams with high turnover rates the best engineers have an easy time finding new work and leave quickly, the worst engineers have a difficult time finding work and remain. This selects for a lower quality team over time.
Engineers who love their work
The resolution is simple. Never have internal deadlines. Operate on a prioritized and ordered list of features. Estimate only when necessary to prioritize and do so in a t-shirt sizing way. Trust your engineers and they will begin to love their work. Engineers who love their work are happy and productive.