On the Situations and Names of the Winds is the title of a fragment of a pseudo-Aristotelian treatise, most likely written by a later author of the Peripatetic school. The two-page work identifies and briefly describes the names not just of the four anemoi, but gives a wind-name to each of the twelve points of the so-called “wind-rose”, slightly less poetically the “compass rose”, which is the figure seen on classical nautical charts and maps that shows the cardinal points as well as points intermediate.
...In both agricultural and maritime settings, the names of the winds were at once practical and phenomenologically basic: to step outside and to feel them was to know how things were in the most basic sense, to “know which way the wind is blowing”, as we still vestigially say, and to find the language to speak of it.
...If I were ever permitted to teach a course on the philosophy of wind, I would begin with the questions: How did the winds lose their names? And what does it mean for us to live in a world of nameless winds? I step outside and I feel a gust. “That’s wind,” I think to myself, and I have nothing more to add beyond that. I don’t know the winds.
The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint.
But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this:
Breaking down stories into tasks is time consuming
The tasks we came up with invariably would change as we worked on the stories
Tasks are repetitive
Tasks were often carried out in parallel
Our estimates didn't improve
It decluttered our task board
It encouraged collaboration throughout the sprint
While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace.