The bipartisan deal contains a pot of money to repair America’s roads and bridges, and build a few more besides. This is the way we usually do infrastructure in America. First we build a ton of roads and bridges that are highly expensive to maintain, especially with our ruinously high construction costs (see this recent article by Jerusalem Demsas). Then, because costs are so high, we wait for a long time to repair the roads and bridges, until civil engineers start screeching, roads get potholed, and there’s a bridge collapse or two. Then we muster up the political will to throw the requisite shit-ton of money at the problem, the potholes and weak bridges get repaired for twice the amount it would have cost had we done it on a regular schedule and three times the amount it would cost if we were a normal rich country. And the whole cycle begins again.
The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint.
But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this:
Breaking down stories into tasks is time consuming
The tasks we came up with invariably would change as we worked on the stories
Tasks are repetitive
Tasks were often carried out in parallel
Our estimates didn't improve
It decluttered our task board
It encouraged collaboration throughout the sprint
While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace.