In the 1960s, the designer Robert Propst worked with the Herman Miller company to produce “The Action Office”, a stylish system of open-plan office furniture that allowed workers to sit, stand, move around and configure the space as they wished.
Propst then watched in horror as his ideas were corrupted into cheap modular dividers, and then to cubicle farms or, as Propst described them, “barren, rathole places”. Managers had squeezed the style and the space out of the action office, but above all they had squeezed the ability of workers to make choices about the place where they spent much of their waking lives.
...It should be easy for the office to provide a vastly superior working environment to the home, because it is designed and equipped with work in mind. Few people can afford the space for a well-designed, well-specified home office. Many are reduced to perching on a bed or coffee table. And yet at home, nobody will rearrange the posters on your wall, and nobody will sneer about your “dog pictures, or whatever”. That seems trivial, but it is not.
The brick is one of those old technologies, like the wheel or paper, that seem to be basically unimprovable. ‘The shapes and sizes of bricks do not differ greatly wherever they are made,’ writes Edward Dobson in the fourteenth edition of his Rudimentary Treatise on the Manufacture of Bricks and Tiles. There’s a simple reason for the size: it has to fit in a human hand. As for the shape, building is much more straightforward if the width is half the length.
The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint.
But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this:
Breaking down stories into tasks is time consuming
The tasks we came up with invariably would change as we worked on the stories
Tasks are repetitive
Tasks were often carried out in parallel
Our estimates didn't improve
It decluttered our task board
It encouraged collaboration throughout the sprint
While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace.