The nineteenth century saw an increasing separation between the treatment of the surface and the structure of designed objects. Mass production and a mobile market economy encouraged the production of heavily ornamented yet cheaply fabricated products. Affordable manufacture allowed the burgeoning middle class to acquire “luxury” goods fashioned after objects formerly reserved for an elite.
Put together with odd bits of the useless Clarice, a survivors’ Clarice was taking shape, all huts and hovels, festering sewers, rabbit cages. And yet, almost nothing was lost of Clarice’s former splendor; it was all there, merely arranged in a different order, no less appropriate to the inhabitants’ needs than it had been before.
The idea of overlap, ambiguity, multiplicity of aspect, and the semilattice are not less orderly than the right tree, but more so. They represent a thicker, tougher, more subtle and more complex view of structure.
Most objects which we are accustomed to call beautiful, such as a painting or a tree, are single-purpose things, in which, through long development or the impress of one will, there is an intimate, visible linkage from fine detail to total structure.
The resistant virtues of the structure that we make depend on their form; it is through their form that they are stable and not because of an awkward accumulation of materials. There is nothing more noble and elegant from an intellectual viewpoint than this; resistance through form.
The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint.
But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this:
Breaking down stories into tasks is time consuming
The tasks we came up with invariably would change as we worked on the stories
Tasks are repetitive
Tasks were often carried out in parallel
Our estimates didn't improve
It decluttered our task board
It encouraged collaboration throughout the sprint
While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace.