Many systems are organized hierarchically. The CERNDOC documentation system is an example, as is the Unix file system, and the VMS/HELP system. A tree has the practical advantage of giving every node a unique name. However, it does not allow the system to model the real world. For example, in a hierarchical HELP system such as VMS/HELP, one often gets to a lead on a tree such as:
HELP COMPILER SOURCE_FORMAT PRAGMAS DEFAULTS
only to find a reference to another leaf: Please see
HELP COMPILER COMMAND OPTIONS DEFAULTS PRAGMAS
and it is necessary to leave the system and re-enter it. What was needed was a link from one node to another, because in this case the information was not naturally organized into a tree.
This, I think, is the brilliance of Notion, and what makes it one of the best examples of “fidelity to digital information” that I’ve come across. The structure of the app reflects the structure of the web itself: digital content is purposefully formatted, like semantic HTML elements, and exists in a hierarchical structure (directories on the web, nested pages in Notion), yet can be linked and referenced to create a complex network of information. And pages in Notion reveal the structure of the information: when nesting a page within a page, the child page always displays on the parent page. There’s no way to create a child page that doesn’t display on a parent page, no way to obscure the structure of the information. The semantic structure of Notion reflects the semantic structure of the web itself.
Truchet's approach was more topological than geometric, and the qualitative aspects of pattern take priority over the metric ones. His principles provide a kind of metaphor for the hierarchy of separation and connection in all things.
The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint.
But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this:
Breaking down stories into tasks is time consuming
The tasks we came up with invariably would change as we worked on the stories
Tasks are repetitive
Tasks were often carried out in parallel
Our estimates didn't improve
It decluttered our task board
It encouraged collaboration throughout the sprint
While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace.