goals
You can't look a big problem too directly in the eye
Let the goals suggest themselves
Lost purposes
So many tactics, so well entrenched
I won't get
People I'd like to meet
At least everything was important
A Quote by Mads MikkelsenMy approach to what I do in my job — and it might even be the approach to my life — is that everything I do is the most important thing I do. Whether it’s a play or the next film. It is the most important thing. I know it’s not going to be the most important thing, and it might not be close to being the best, but I have to make it the most important thing. That means I will be ambitious with my job and not with my career. That’s a very big difference, because if I’m ambitious with my career, everything I do now is just stepping-stones leading to something — a goal I might never reach, and so everything will be disappointing. But if I make everything important, then eventually it will become a career. Big or small, we don’t know. But at least everything was important.
Theory of Change
An Essay by Aaron SwartzA theory of change is the opposite of a theory of action — it works backwards from the goal, in concrete steps, to figure out what you can do to achieve it. To develop a theory of change, you need to start at the end and repeatedly ask yourself, “Concretely, how does one achieve that?”
Four principles
The essential purpose of Direct Management, as we understand the term, is to create buildings which are whole. This means that each part of the building is right in relation to the other parts, and to the part of the land that makes the buildings and the land more beautiful.
I will try to summarize the real meaning of Direct Management.
- The design evolves during construction. This means that the form of control over designs does not stop when drawings are finished, but goes on, continuously, before, during, and after construction. This cannot be done if architect and contractor are separate, or consider their jobs separately. It will only happen if the person who controls the design at the beginning actually controls the construction, too.
- Flexible cost control. Cost control requires continuous changing of ideas about what is built, in relation to money that is available, and in relation to what has been done already.
- Experience with one's hands. It is also impossible for an architect to have enough knowledge to control the process successfully, unless they have experienced almost every phase of construction with their own hands.
- Love of craft and the joy in the physical process of making. In the old days, making a building was clearly understood as a work of making. In this word, designing and physically building are inseparable. However, in the modern world, design has become separated from construction. Architects think of their work as designing, on paper, with the idea that the building process is a separate process. This is not what I call making at all. A good building can only be created, when it is deeply understood as something which is made, by a direct connection of the act of making, and the act of feeling, with your hands.