images
What the painting was not about
The past of his image upon me
Mere retinal art
The eye does not see
The Gosling Effect
Apparency
Half a century ago, Stern discussed this attribute of an artistic object and called it apparency. While art is not limited to this single end, he felt that one of its two basic functions was "to create images which by clarity and harmony of form fulfill the need for vividly comprehensible appearance." In his mind, this was an essential first step toward the expression of inner meaning.
As plain as day
The personal experience of most of us will testify to this persistence of an illusory image long after its inadequacy is conceptually realized. We stare into the jungle and see only the sunlight on the green leaves, but a warning noise tells us that an animal is hidden there. The observer then learns to interpret the scene by singling out "give-away" clues and by reweighting previous signals. The camouflaged animal may now be picked up by the reflection of its eyes. Finally by repeated experience the entire pattern of perception is changed, and the observer need no longer consciously search for give-aways, or add new data to an old framework. They have achieved an image which will operate successfully in the new situation, seeming natural and right. Quite suddenly the hidden animal appears among the leaves, "as plain as day."
The language of art
Everything points to the conclusion that the phrase 'the language of art' is more than a loose metaphor, that even to describe the visible world in images we need a developed system of schemata.
Words and Images
An Essay by René Magritte
Four principles
The essential purpose of Direct Management, as we understand the term, is to create buildings which are whole. This means that each part of the building is right in relation to the other parts, and to the part of the land that makes the buildings and the land more beautiful.
I will try to summarize the real meaning of Direct Management.
- The design evolves during construction. This means that the form of control over designs does not stop when drawings are finished, but goes on, continuously, before, during, and after construction. This cannot be done if architect and contractor are separate, or consider their jobs separately. It will only happen if the person who controls the design at the beginning actually controls the construction, too.
- Flexible cost control. Cost control requires continuous changing of ideas about what is built, in relation to money that is available, and in relation to what has been done already.
- Experience with one's hands. It is also impossible for an architect to have enough knowledge to control the process successfully, unless they have experienced almost every phase of construction with their own hands.
- Love of craft and the joy in the physical process of making. In the old days, making a building was clearly understood as a work of making. In this word, designing and physically building are inseparable. However, in the modern world, design has become separated from construction. Architects think of their work as designing, on paper, with the idea that the building process is a separate process. This is not what I call making at all. A good building can only be created, when it is deeply understood as something which is made, by a direct connection of the act of making, and the act of feeling, with your hands.