See how many a pretty thing
I always from the cube can bring:
Chair and sofa, bench and table,
Desk to write at when I’m able,
All the household furniture,
Even baby’s bed I’m sure;
Not a few such things I see;
Stove and sideboard here can be.
Many things, both old and new,
My dear cube brings into view;
So my cube much pleases me,
Because through it so much I see.
It is a little world.
The details of a building cannot be made alive when they are made from modular parts
If the builder wants to build the room from modular four-foot panels, he must change the size of the rooms, and change their shape, to fit his panels.
In such a building system, it is impossible for a person to create a plan which reflects the larger subtleties of site or plan. Each plan will always be chopped and disfigured to make it fit the building details.
To make the building live, its patterns must be generated on the site, so that each one takes its own shape according to its context.
One of the most pervasive features of these buildings is the fact that they are “modular.” They are full of identical concrete blocks, identical rooms, identical houses, identical apartments in identical apartment buildings. The idea that a building can - and ought - to be made of modular units is one of the most pervasive assumptions of twentieth-century architecture.
Nature is never modular. Nature is full of almost similar units (waves, raindrops, blades of grass) - but though the units of one kind are all alike in their broad structure, no two are ever alike in detail.
The same broad features keep recurring over and over again. And yet, in their detailed appearance these broad features are never twice the same.
The modernist architect Le Corbusier was an admirer of American grain elevators, suggesting that their regularity and modularity could serve as a model for other kinds of buildings. At least one later architect took the suggestion seriously. The Quaker Square Inn in Akron, Ohio, occupies the shell of a former elevator. If you're in town for the night, you can rent a round room in one of the silos.
In the 1960s, the designer Robert Propst worked with the Herman Miller company to produce “The Action Office”, a stylish system of open-plan office furniture that allowed workers to sit, stand, move around and configure the space as they wished.
Propst then watched in horror as his ideas were corrupted into cheap modular dividers, and then to cubicle farms or, as Propst described them, “barren, rathole places”. Managers had squeezed the style and the space out of the action office, but above all they had squeezed the ability of workers to make choices about the place where they spent much of their waking lives.
...It should be easy for the office to provide a vastly superior working environment to the home, because it is designed and equipped with work in mind. Few people can afford the space for a well-designed, well-specified home office. Many are reduced to perching on a bed or coffee table. And yet at home, nobody will rearrange the posters on your wall, and nobody will sneer about your “dog pictures, or whatever”. That seems trivial, but it is not.
The brick is one of those old technologies, like the wheel or paper, that seem to be basically unimprovable. ‘The shapes and sizes of bricks do not differ greatly wherever they are made,’ writes Edward Dobson in the fourteenth edition of his Rudimentary Treatise on the Manufacture of Bricks and Tiles. There’s a simple reason for the size: it has to fit in a human hand. As for the shape, building is much more straightforward if the width is half the length.
The essential purpose of Direct Management, as we understand the term, is to create buildings which are whole. This means that each part of the building is right in relation to the other parts, and to the part of the land that makes the buildings and the land more beautiful.
I will try to summarize the real meaning of Direct Management.
The design evolves during construction. This means that the form of control over designs does not stop when drawings are finished, but goes on, continuously, before, during, and after construction. This cannot be done if architect and contractor are separate, or consider their jobs separately. It will only happen if the person who controls the design at the beginning actually controls the construction, too.
Flexible cost control. Cost control requires continuous changing of ideas about what is built, in relation to money that is available, and in relation to what has been done already.
Experience with one's hands. It is also impossible for an architect to have enough knowledge to control the process successfully, unless they have experienced almost every phase of construction with their own hands.
Love of craft and the joy in the physical process of making. In the old days, making a building was clearly understood as a work of making. In this word, designing and physically building are inseparable. However, in the modern world, design has become separated from construction. Architects think of their work as designing, on paper, with the idea that the building process is a separate process. This is not what I call making at all. A good building can only be created, when it is deeply understood as something which is made, by a direct connection of the act of making, and the act of feeling, with your hands.