emptiness
Occupied by a void
Roland Barthes wrote that the centre of Tokyo is occupied by a void...it is a quiet forest that lies at Tokyo's heart.
...The centre of Tokyo is certainly a void, but one that is protected by a circular train line, the Yamanote, which forms a 40-km (25-mile) loop around it. It seems to me that this ring of steel emphasizes the importance of the void, and the depth of its significance.
Names vs. The Nothing
This is the first site along the tour. In here we have a void. I remember the building that used to stand here, it was painted blue. Passing through it, you can imagine how us, as ghosts – should the building be standing here – would have to actually be invisible to pass through these walls and now it’s the reverse. The building is the ghost and we’re passing through these walls.
Erased de Kooning Drawing
Once, Robert Rauschenberg erased most of a drawing by Willem de Kooning, and then named it Erased de Kooning Drawing.
I am in no way certain what this is connected to either, but I suspect it is connected to more than I once believed it to be connected to.
Most important of all are the pauses
Japanese music is above all a music of reticence, of atmosphere. When recorded, or amplified by a loudspeaker, the greater part of its charm is lost. In conversation, too, we prefer the soft voice, the understatement. Most important of all are the pauses. Yet the phonograph and radio render these moments of silence utterly lifeless. And so we distort the arts themselves to curry favor for them with the machines.
Empty rooms
A Quote by Bruce NaumanI don't think empty rooms are ever really empty. I think we subconsciously put our emotions into them.
Four principles
The essential purpose of Direct Management, as we understand the term, is to create buildings which are whole. This means that each part of the building is right in relation to the other parts, and to the part of the land that makes the buildings and the land more beautiful.
I will try to summarize the real meaning of Direct Management.
- The design evolves during construction. This means that the form of control over designs does not stop when drawings are finished, but goes on, continuously, before, during, and after construction. This cannot be done if architect and contractor are separate, or consider their jobs separately. It will only happen if the person who controls the design at the beginning actually controls the construction, too.
- Flexible cost control. Cost control requires continuous changing of ideas about what is built, in relation to money that is available, and in relation to what has been done already.
- Experience with one's hands. It is also impossible for an architect to have enough knowledge to control the process successfully, unless they have experienced almost every phase of construction with their own hands.
- Love of craft and the joy in the physical process of making. In the old days, making a building was clearly understood as a work of making. In this word, designing and physically building are inseparable. However, in the modern world, design has become separated from construction. Architects think of their work as designing, on paper, with the idea that the building process is a separate process. This is not what I call making at all. A good building can only be created, when it is deeply understood as something which is made, by a direct connection of the act of making, and the act of feeling, with your hands.