Misinterpretation as inspiration A lot of people think dreams and drugs involve some magical inspiration. I think otherwise. I rarely get inspired by dreams or drugs, but I have my own secret source of inspiration: mishearing other people. Somebody says something, I misinterpret it, and the misinterpretation is quite interesting – more interesting than anything I would have come up with on my own if asked to generate an interesting idea. Maybe it’s a clever joke or turn of phrase. Maybe it’s a neat idea. Sometimes I misunderstand people’s entire positions, and end up with positions much more interesting than the ones they were trying to push. Scott Alexander, Negative Creativity slatestarcodex.com Mondegreen mistakesinterestdrugsdreamscreativitymondegreens
Poetic drugs In the final chapters Bachelard lets slip (a confession really) how if he "were a psychiatrist," he would recommend a poem by Baudelaire to treat "anguish." His squabble then is not with the purpose but rather the approach of a still-young profession. And of course, why not treat the power of great poems as something akin to "virtual 'drugs'"? Mark Z. Danielewski, The Poetics of Space psychologypoetrypaindrugs
Doubling Obetrolling didn't make me self-conscious. But it did make me much more self-aware. If I was in a room, and had taken an Obetrol or two with a glass of water and they'd taken effect, I was now not only in the room, but I was aware that I was in the room. In fact, I remember I would often think, or say to myself, quietly but very clearly, 'I am in this room.' It's difficult to explain this. At the time, I called it 'doubling', but I'm still not entirely sure what I meant by this, nor why it seemed so profound and cool to not only be in a room but be totally aware that I was in the room. David Foster Wallace, The Pale King drugsattention
Why we stopped breaking down stories into tasks An Article by Adam Silver adamsilver.io The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint. But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this: Breaking down stories into tasks is time consuming The tasks we came up with invariably would change as we worked on the stories Tasks are repetitive Tasks were often carried out in parallel Our estimates didn't improve It decluttered our task board It encouraged collaboration throughout the sprint While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace. Why We Don't Do Daily Stand-Ups at Supercede agile