Safety cut rope axe man In the first nuclear reactor, constructed by Enrico Fermi in 1942 under the bleachers of the University of Chicago football stadium, the control rods were held up by a manila rope. A man with an axe was told to cut the rope if the reactor got out of hand. This "safety cut rope axe man" is supposedly the origin of the term SCRAM for an emergency shutdown procedure. Brian Hayes, Infrastructure: A Guide to the Industrial Landscape wordsacronymsenergy
Why we stopped breaking down stories into tasks An Article by Adam Silver adamsilver.io The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint. But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this: Breaking down stories into tasks is time consuming The tasks we came up with invariably would change as we worked on the stories Tasks are repetitive Tasks were often carried out in parallel Our estimates didn't improve It decluttered our task board It encouraged collaboration throughout the sprint While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace. Why We Don't Do Daily Stand-Ups at Supercede agile