texture
Restrained beauty
White walls
The interplay of pattern and texture
Some of the more enjoyable surfaces (for example, the grain of a fine mahogany table top or a Japanese sword) have an interplay between pattern and texture which, though two-dimensional, suggests the unseen internal three-dimensional array.
American Folk Art Museum, New York City, 1998–2001
As we draw closer, we see that the three-faceted planes of the museum are fabricated out of rectangular panels made of white bronze that was poured directly into dammed forms on the concrete floor of the foundry, producing a surface texture similar to both metal and stone.
In search of visual texture
An Article by Rachel PruddenI’m now more inclined to attribute Looseleaf’s power to its visual texture than to some cognitive media-style abstraction. And the visual texture owes more to the beauty (yes, beauty!) of the original pdfs from the Vasulka Archive. Perhaps the demo is best understood not as a prototype generic tool, but as a specific curated experience in its own right, with form and content claiming equal importance in its overall success.
Even so, I think there are some general lessons that can be drawn from this demo:
- Content is not inert
- Visual texture lets content breathe
- Visual texture lets the eye wander without losing itself
Subtilitas
A BlogSUBTĪLITĀS (latin; noun f., 3rd):
fineness of texture, logic, detail; slenderness, exactness, acuteness; sharpness : precision
Software that nobody wants
Finding value is the result of enabling individual and group-level discovery attempts. It's not the result of everyone following one leader's gut.
What just happened is a new software product/feature was created that no customer wanted. This happens way too often. In fact, most hyper important software projects that must be done by date certain or else, have deep flaws that cause some variation of this phenomenon, flaws that include:
- Not wanted - Company specified a solution to a problem that customers don't actually have
- No Rarity - Company is pursuing an iKnockoff of existing products. The market already has two scaled competitors with working solutions, customers naturally spend budget on products that are already successful to avoid risk
- Incorrect Packaging - Customers need a website, but the company created an iOS app instead
- Incorrect Pricing - Customers need SaaS pricing, but the company created a shrink wrapped, on-premise solution with CapEx and maintenance agreements instead
The 'date scrum' anti-pattern
Date Scrum is an R&D pattern where developers are asked to estimate software project requirements upfront for the entirety of the project. After the project is green lighted and the budget is set based on the final estimates, the team then holds daily scrums to status and manage risk as they “iterate” the solution toward the release date. To some, this approach is described as doing Waterfall in sprints.
The fundamental problem with Date Scrum is that the team is de-focused from discovering the best solution. Instead they are heavily focused on delivering Something™ by the Date™. Engineers are problem solvers, and if the primary problem becomes delivering Something™ that will pass QA by the Date™, they will, with enough pressure, solve that exact problem.