Tracing Power Lines with the Pylon Appreciation Society
Pylons
Not all the towers along a transmission line are identical. Look closely at a tower where the line makes a sharp turn and you will likely find it is wider and beefier than other towers along the route. The added strength and weight are needed to resist the unbalanced pull of the conductors, which might overturn an ordinary tower. These special towers are called deviation or angle towers.
The transmission-line tower everybody knows is an Erector Set latticework of steel girders and diagonal braces. The techniques for designing and building these towers are the same ones used in constructing steel bridge trusses or crane booms. The individual pieces can be made cheaply from rolled steel and then bolted together on the site. This last point is more important than it might seem: transporting a fully assembled tower 100 feet tall is an awkward and expensive business.
A haunting, syncopated music
"Rappers" on the roof of the electrostatic precipitator knock the accumulated dust free, letting it fall into the storage hopper. Each rapper is the size and shape of a baseball bat. Inside is an electromagnet that pulls a steel plunger upward, then allows it to fall again, producing a sharp knock. The rappers are energized at seemingly random intervals, producing a haunting, syncopated music. (The rhythm seemed more modern jazz than rap.)
Safety cut rope axe man
In the first nuclear reactor, constructed by Enrico Fermi in 1942 under the bleachers of the University of Chicago football stadium, the control rods were held up by a manila rope. A man with an axe was told to cut the rope if the reactor got out of hand. This "safety cut rope axe man" is supposedly the origin of the term SCRAM for an emergency shutdown procedure.
Color coding
Telephone wires erupt in a multicolor cascade in a ground-level, pedestal-type splice case on a city street.
Dividing the set of 10 colors into two contrasting groups of 5 allows for exactly 25 combinations with one color from each group; thus, each pair in a bundle can be uniquely colored. A similar color code is applied to the ribbons that bind together all the pairs in a bundle, and to those of the superbundles. The result is highly festive! A specific wire might be identified as the blue-red conductor within the orange-black bundle within the brown-yellow superbundle.
Software that nobody wants
Finding value is the result of enabling individual and group-level discovery attempts. It's not the result of everyone following one leader's gut.
What just happened is a new software product/feature was created that no customer wanted. This happens way too often. In fact, most hyper important software projects that must be done by date certain or else, have deep flaws that cause some variation of this phenomenon, flaws that include:
- Not wanted - Company specified a solution to a problem that customers don't actually have
- No Rarity - Company is pursuing an iKnockoff of existing products. The market already has two scaled competitors with working solutions, customers naturally spend budget on products that are already successful to avoid risk
- Incorrect Packaging - Customers need a website, but the company created an iOS app instead
- Incorrect Pricing - Customers need SaaS pricing, but the company created a shrink wrapped, on-premise solution with CapEx and maintenance agreements instead
The 'date scrum' anti-pattern
Date Scrum is an R&D pattern where developers are asked to estimate software project requirements upfront for the entirety of the project. After the project is green lighted and the budget is set based on the final estimates, the team then holds daily scrums to status and manage risk as they “iterate” the solution toward the release date. To some, this approach is described as doing Waterfall in sprints.
The fundamental problem with Date Scrum is that the team is de-focused from discovering the best solution. Instead they are heavily focused on delivering Something™ by the Date™. Engineers are problem solvers, and if the primary problem becomes delivering Something™ that will pass QA by the Date™, they will, with enough pressure, solve that exact problem.