Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
In the middle of the 2000s, the designers at creative consultancy Landor installed Adobe Photoshop on their computers and started using it. General manager Antonio Marazza tells author David Sax:
“Overnight, the quality of their designs seemed to decline. After a few months of this, Landor’s Milan office gave all their designers Moleskine notebooks, and banned the use of Photoshop during the first week’s work on a project. The idea was to let their initial ideas freely blossom on paper, without the inherent bias of the software, before transferring them to the computer later for fine-tuning. It was so successful, this policy remains in place today.”