Why we stopped breaking down stories into tasks An Article by Adam Silver adamsilver.io The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint. But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this: Breaking down stories into tasks is time consuming The tasks we came up with invariably would change as we worked on the stories Tasks are repetitive Tasks were often carried out in parallel Our estimates didn't improve It decluttered our task board It encouraged collaboration throughout the sprint While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace. Why We Don't Do Daily Stand-Ups at Supercede agile
Up and Down the Ladder of Abstraction An Essay by Bret Victor worrydream.com The most powerful way to gain insight into a system is by moving between levels of abstraction. Many designers do this instinctively. But it's easy to get stuck on the ground, experiencing concrete systems with no higher-level view. It's also easy to get stuck in the clouds, working entirely with abstract equations or aggregate statistics. This interactive essay presents the ladder of abstraction, a technique for thinking explicitly about these levels, so a designer can move among them consciously and confidently. From a roving viewpoint abstractionunderstandinginteraction