An Article by Geoff BoeingMy article “Off the Grid… and Back Again? The Recent Evolution of American Street Network Planning and Design” has been published by the Journal of the American Planning Association and won the 2020 Stough-Johansson Springer Award for best paper. It identifies recent nationwide trends in American street network design, measuring how urban planners abandoned the grid and embraced sprawl over the 20th century, but since 2000 these trends have rebounded, shifting back toward historical design patterns.
Urban Street Network Orientation
An Article by Geoff BoeingThis study measures the entropy (or disordered-ness) of street bearings in each street network, along with each city’s typical street segment length, average circuity, average node degree, and the network’s proportions of four-way intersections and dead-ends. It also develops a new indicator of orientation-order that quantifies how a city’s street network follows the geometric ordering logic of a single grid. These indicators, taken in concert, reveal the extent and nuance of the grid.
Deadlines are bullshit
In software development deadlines are a necessary evil. It is important to understand when they are necessary, and it is important to understand why they are evil.
- External vs. internal deadlines
- Why are internal deadlines evil?
- Engineers who love their work
External vs. internal deadlines
When are deadlines necessary?
- Contractual obligations
- Technical liabilities (e.g., dependency EOL)
- Compliance, government, investors, and other external stakeholders
What do all of these deadlines have in common? They are all important. They are all deadlines that cannot be missed. They are all external.
When are deadlines evil?
- Your manager says you have a deadline
- Your software development methodology says you have deadlines
What do all of these deadlines have in common? None of them are important. They are arbitrary. They are all internal. They are all bullshit.
Why are internal deadlines evil?
- Estimation: When estimating engineering work a substantial time investment is required by an engineer in order to get an accurate estimate.
- Misaligned Incentives: There is an incentive to lie and give estimates much longer than the feature is truly expected to take.
- Low Morale: Deadlines are likely to be missed often. Repeated failure has a cost to the morale of the team.
- Micromanagement: Deadlines are wielded by middle managers as a whip to harass and annoy engineers working on features.
- High Stress: When engineers feel the pressure of other stakeholders holding deadlines over their heads it creates an environment of high stress.
- High Turnover: On teams with high turnover rates the best engineers have an easy time finding new work and leave quickly, the worst engineers have a difficult time finding work and remain. This selects for a lower quality team over time.
Engineers who love their work
The resolution is simple. Never have internal deadlines. Operate on a prioritized and ordered list of features. Estimate only when necessary to prioritize and do so in a t-shirt sizing way. Trust your engineers and they will begin to love their work. Engineers who love their work are happy and productive.