Agile Scrum is not working An Article by Gene Bond iism.org The Agile founders had it right, one size doesn't fit all. What the founders perhaps didn’t foresee, or couldn’t agree on, is that in order for the world to scale and consume their wisdom, it had to be packaged as concrete practices, not as abstract classes with virtual methods to be defined in context. And to the proponents of Agile Scrum, give them their due, for their part, they made it concrete – Agile Scrum has been packaged and delivered. Yet much work remains to realize the promise of Agile, which in summary is, the realization of wise use of lightweight development practices and workflows that flexibly adapt to the changing and evolving needs of customers. Beware SAFe, an Unholy Incarnation of Darkness agile
Combinations and arrangements Everything designed has an element of arbitrariness in its form. Loewy described how groups of his designers used to go about designing a new model automobile. Different groups were given different tasks, such as the front and rear of the car, and the conceptual work began, to be cut off at some predetermined time by deadlines that were imposed at the outset. After a time, there were "piles of rough sketches," and Loewy saw the design proceed as follows: Now the important process of elimination begins. From the roughs, I select the designs that indicate germinal direction. Those that show the greatest promise are studied in detail, and these in turn are used in combination or arrangements with one another. A promising front treatment can be tried in combination with a likely side elevation sketch, etc. From this a new set of designs emerges. These are then sketched in detail. After careful analysis, they boil down to four or five. Raymond Loewy, The Evolution of Useful Things Useless work on useful things drawing