Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
Radić's texts are almost always assemblages of several pieces or paragraphs that, although written by an architect, do not attempt to refer to a particular project or work (and if they do, it is always laterally, avoiding explanations of the how and the why, or demonstrations and apologies).
Like notes from a fragmentary diary or a review of a collection of memories, at times they share the melancholy tone of the writings by Aldo Rossi and at other times they recall the obscure density of John Hejduk's poems.
There are places I will never go. Due to laziness or boredom, or premature fatigue. But there are also landscapes or buildings I should have visited a long time ago. This text reviews those possible places. All of them are part of my story, and they are places I am familiar with in one way or another.