Not all the towers along a transmission line are identical. Look closely at a tower where the line makes a sharp turn and you will likely find it is wider and beefier than other towers along the route. The added strength and weight are needed to resist the unbalanced pull of the conductors, which might overturn an ordinary tower. These special towers are called deviation or angle towers.
The transmission-line tower everybody knows is an Erector Set latticework of steel girders and diagonal braces. The techniques for designing and building these towers are the same ones used in constructing steel bridge trusses or crane booms. The individual pieces can be made cheaply from rolled steel and then bolted together on the site. This last point is more important than it might seem: transporting a fully assembled tower 100 feet tall is an awkward and expensive business.
PEOPLE ARE NOT THEIR JOB TITLES.
TEAM MEMBERS ARE NOT “RESOURCES”.
PEOPLE WORK BEST WHEN THEY CAN BE THEIR FULL SELVES.
YOU CANNOT CALCULATE AN ROI FOR DESIGN.
FRAMING THE PROBLEM IS MORE IMPORTANT THAN SOLVING THE PROBLEM.
(DESIGN) LEADERSHIP IS MORE TALKING THAN DOING.
YOU’LL DO A BETTER JOB IF YOU LIGHTEN UP
IF YOU HAVEN’T PISSED SOMEONE OFF, YOU’RE NOT DOING YOUR JOB RIGHT.
NO ONE OUTSIDE YOUR TEAM UNDERSTANDS WHAT IT TAKES TO DO GOOD WORK.
THE OUTCOMES ARE BETTER WHEN EVERYONE IS A DESIGNER.
AGILE TRANSFORMATIONS ARE HOSTILE TO GOOD DESIGN.
WHAT A DESIGN TEAM NEEDS MOST IS A CLEAR SENSE OF PURPOSE.
YOU ARE ON THE FRONT LINE OF A GLOBAL WAR FOR TALENT.
EVERYONE APPLYING FOR A ROLE HAS AN INFLATED TITLE.
INTERVIEWS ARE A POOR WAY OF ASSESSING CANDIDATES.
DESIGN EXERCISES ARE A BAD INTERVIEWING PRACTICE.
YOU WILL NEVER HAVE ENOUGH DESIGNERS.
YOU WILL NEVER HAVE ENOUGH TIME.
THE SKILLS THAT GOT YOU HERE ARE NOT THE SKILLS THAT WILL CARRY YOU FORWARD.