planning
The Thing-deadline calculus
The best-laid plans
But bulldozers move mountains
Good design is redesign
Obsessed with absolute numbers
A warning against the limitations of my own prescriptions
The plan must anticipate all that is needed
Many a corner office
Individuals matter
Driving engineers to an arbitrary date is a value destroying mistake
The value-destroying effect of arbitrary date pressure on code
An Article by Gandalf HudlowThe mandate from above is clear, just get it done! Avoid everything that's in the way: all advice, all expertise, all discovery efforts that detract from hitting the Date™!
What these organizations don't realize is that all software change can be modeled as three components: Value, Filler and Chaos. Chaos destroys Value and Filler is just functionality that nobody wants. When date pressure is applied to software projects, the work needed to remove Chaos is subtly placed on the chopping block. Work like error handling, clear logging, chaos & load testing and other quality work is quietly deferred in favor of hitting the Date™.
Hofstadter's Law
An Idea by Douglas HofstadterIt always takes longer than you expect, even when you take into account Hofstadter's Law.
Planning doesn't make for better software
A Fragment by Robin RendleMy own time in a Silicon Valley startup has proved this much to be true; planning doesn’t make for better software. In fact today our design systems team doesn’t have sprints, we don’t have tickets or a daily standup. Each day we come to work, figure out what’s the most important thing that we could be doing, and then we—gasp!—actually do it.
Watching so many other teams slowly flail about whilst they plan for quarter 3.2 of subplan A, whilst our team produces more work in a week than they all do combined in a quarter has been shocking to me.
After four years of working in a large startup, I know what I always assumed was true: you don’t need a plan to make a beautiful thing. You really don’t. In fact, there’s a point where overplanning can be a signal of inexperience and fear and bullshit. The scrum board and the sprints and the inane meetings each and every day are not how you build another Super Mario 64.
Instead all you have to do is hire smart people, trust them to do their best work, and then get the hell out of their way.
Yagni
A Definition by Martin FowlerYagni originally is an acronym that stands for "You Aren't Gonna Need It". It is a mantra from Extreme Programming that's often used generally in agile software teams. It's a statement that some capability we presume our software needs in the future should not be built now because "you aren't gonna need it".
Drawing for parallel design thinking
An important feature of their strategy is parallel working - keeping design activity going at many levels simultaneously. The best cognitive aid for supporting and maintaining parallel design thinking is drawing. Drawing with the conventional tools of paper and pencil gives the flexibility to shift levels of detail instantaneously; allows partial, different views at different levels of detail to be developed side by side, or above and below and overlapping; keeps records of previous views, ideas and notes that can be accessed relatively quickly and inserted into the current frame of reference; permits and encourages the simultaneous, non-hierarchical participation of co-workers, using a common representation.
The drawing of partial solutions or representations also aids the designer’s thinking processes, and provides some ‘talk-back’. As well as drawing, innovative designers frequently like to undertake practical work related to the design solution, such as building models or mock-ups, or participating in construction.