We optimize what we measure Scrum does not say “only focus on output”, but, unfortunately, humans will optimize for what they measure. If you worry about story points & hitting your estimations, that’s what is going to consume your attention. That is what you and your team will optimize for. And that is the core critique of Scrum as it is practiced: That it focuses a product team’s attention so heavily on delivery — on building lots of features quickly & efficiently — that teams fail to focus on spending time to discover what the right thing to build is. Henry Latham, Why Scrum is killing your product optimizationagilefeatures
Wang tiles Wang tiles (Hao Wang, 1961) are a class of formal systems. They are modelled visually by square tiles with a color on each side. A set of such tiles is selected, and copies of the tiles are arranged side by side with matching colors, without rotating or reflecting them. The basic question about a set of Wang tiles is whether it can tile the plane or not, i.e., whether an entire infinite plane can be filled this way. The next question is whether this can be done in a periodic pattern. In 1966, Wang's student Robert Berger solved the problem in the negative. He proved that no algorithm for the problem can exist, by showing how to translate any Turing machine into a set of Wang tiles that tiles the plane if and only if the Turing machine does not halt. The undecidability of the halting problem then implies the undecidability of Wang's tiling problem. Wikipedia en.wikipedia.org Truchet TilesThe Tiling Patterns of Sebastien Truchet and the Topology of Structural Hierarchy mathalgorithms