We optimize what we measure Scrum does not say “only focus on output”, but, unfortunately, humans will optimize for what they measure. If you worry about story points & hitting your estimations, that’s what is going to consume your attention. That is what you and your team will optimize for. And that is the core critique of Scrum as it is practiced: That it focuses a product team’s attention so heavily on delivery — on building lots of features quickly & efficiently — that teams fail to focus on spending time to discover what the right thing to build is. Henry Latham, Why Scrum is killing your product optimizationagilefeatures
Separation of surface and structure The nineteenth century saw an increasing separation between the treatment of the surface and the structure of designed objects. Mass production and a mobile market economy encouraged the production of heavily ornamented yet cheaply fabricated products. Affordable manufacture allowed the burgeoning middle class to acquire “luxury” goods fashioned after objects formerly reserved for an elite. Ellen Lupton & J. Abbott Miller, The ABC's of ▲■●: The Bauhaus and Design Theory The drop press structurematerial