What of machines and prefabrication? How do they compare?
Well, the machine has its limits. We, using handcrafted methods, do things that machines cannot do. Of course, it's not fast like a machine. And in complicated areas like here, things wouldn't go the same using a machine as it would by hand.
We use numerous variations of all these connecting and splicing joints. Using a machine, [the wood joints] can all be made uniform, but really, we need to consider whether that's a good thing. It's better to make each mechanism and joint by considering what's suitable for each unique condition.
A dragline is the largest of the machines used to strip away the overburden and mine the ore layer at an open-cast mine. A bucketload for this particular dragline, one of the world's largest, is 220 cubic yards. Note the school bus, which would easily fit in the bucket.
"Rappers" on the roof of the electrostatic precipitator knock the accumulated dust free, letting it fall into the storage hopper. Each rapper is the size and shape of a baseball bat. Inside is an electromagnet that pulls a steel plunger upward, then allows it to fall again, producing a sharp knock. The rappers are energized at seemingly random intervals, producing a haunting, syncopated music. (The rhythm seemed more modern jazz than rap.)
Today population forecasts are based on extensive and reliable data. However, no such demographic base exists for the world's growing population of machines and devices. Now may be the time to take machine demography seriously and enter into real discussions about machine population control.
The couple of years in question here saw one of the largest bureaucracies anywhere undergo a convulsion in which it tried to reconceive itself as a non- or even anti-bureaucracy, which at first might sound like nothing more than an amusing bit of bureaucratic folly. In fact, it was frightening; it was a little like watching an enormous machine come to consciousness and start trying to think and feel like a real human.
When I wrote about the virtues of empowered product teams, I was referring to what I’ll continue to call here as product teams. Specifically, they are cross-functional (product, design and engineering); they are focused on and measured by outcomes (rather than output); and they are empowered to figure out the best way to solve the problems they’ve been asked to solve.
In an empowered product team, the product manager is explicitly responsible for ensuring value and viability; the designer is responsible for ensuring usability; and the tech lead is responsible for ensuring feasibility. The team does this by truly collaborating in an intense, give and take, in order to discover a solution that work for all of us.
However, in a feature team, you still (hopefully) have a designer to ensure usability, and you have engineers to ensure feasibility, but, and this is critical to understand: the value and business viability are the responsibility of the stakeholder or executive that requested the feature on the roadmap.
If something ships from one of the companies I advise, and it is virtually unusable because of poor design (which as we all know occasionally does happen), you can bet I go directly to the designer and ask how this happened? It is absolutely on the designer to ensure this does not happen, so something went wrong.
Similarly, if the product ships and performance is terrible you can bet I go directly to the tech lead with the same question.
And most frequently of all, if something ships and the analytics show that it’s either not being bought or not being used, or it turns out that it violates some business constraint like compliance or privacy, you can bet I go right to the product manager with that question.