Permaculture systems seek to stop the flow of nutrient and energy off the site and instead turn them into cycles, so that, for instance, kitchen wastes are recycles to compost; animal manures are directed to biogas production or to the soil; household greywater flows to the garden; green manures are turned into the earth; leaves are raked up around trees as mulch.
The conscious design and maintenance of agriculturally productive systems which have the diversity, stability, and resilience of natural ecosystems. It is the harmonious integration of the landscape with people providing their food, energy, shelter and other material and non-material needs in a sustainable way.
The [Lake Erie] ecosystem underwent a series of changes, each of which were related. There was an increase in the human population; which led to higher phosophorus levels in the water; which led, at last, to an increased level of algae in the lake. In effect, Lake Erie’s ecosystem was rewritten. Changed by human activities into…something else.
But Franklin cites the study because it’s doing something slightly novel: applying Selye’s principle of stress to ecological systems, suggesting that they are, much like humans, just as susceptible to external stressors. And I’ve been thinking about that a lot lately, especially this week. Because Franklin’s suggesting that the work begins not by “fixing the system.” Rather, she suggests it’s about shifting the priority a little: to removing whatever stress you can.
When I wrote about the virtues of empowered product teams, I was referring to what I’ll continue to call here as product teams. Specifically, they are cross-functional (product, design and engineering); they are focused on and measured by outcomes (rather than output); and they are empowered to figure out the best way to solve the problems they’ve been asked to solve.
In an empowered product team, the product manager is explicitly responsible for ensuring value and viability; the designer is responsible for ensuring usability; and the tech lead is responsible for ensuring feasibility. The team does this by truly collaborating in an intense, give and take, in order to discover a solution that work for all of us.
However, in a feature team, you still (hopefully) have a designer to ensure usability, and you have engineers to ensure feasibility, but, and this is critical to understand: the value and business viability are the responsibility of the stakeholder or executive that requested the feature on the roadmap.
If something ships from one of the companies I advise, and it is virtually unusable because of poor design (which as we all know occasionally does happen), you can bet I go directly to the designer and ask how this happened? It is absolutely on the designer to ensure this does not happen, so something went wrong.
Similarly, if the product ships and performance is terrible you can bet I go directly to the tech lead with the same question.
And most frequently of all, if something ships and the analytics show that it’s either not being bought or not being used, or it turns out that it violates some business constraint like compliance or privacy, you can bet I go right to the product manager with that question.