There is a hidden cost to having a hypothesis. It arises from the relationship between night science and day science, the two very distinct modes of activity in which scientific ideas are generated and tested, respectively [1, 2]. With a hypothesis in hand, the impressive strengths of day science are unleashed, guiding us in designing tests, estimating parameters, and throwing out the hypothesis if it fails the tests. But when we analyze the results of an experiment, our mental focus on a specific hypothesis can prevent us from exploring other aspects of the data, effectively blinding us to new ideas.
Walking intrigues the deskbound. We romanticize it, but do we do it justice? Do we walk properly? Can one walk improperly and, if so, what happens when the walk is corrected?
This talk centered on Hamming's observations and research on the question "Why do so few scientists make significant contributions and so many are forgotten in the long run?"
Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.