Beware SAFe, an Unholy Incarnation of Darkness An Article by Sean Dexter seandexter1.medium.com The Lean Portfolio Management function that controls funding, are given sole authority to approve which Portfolio Epics move into each stream. Epics are not explanations about a problem that needs to be solved. They are pre-formed ideas about how best to solve those problems. Right away we can see signs of the old-school mindset of viewing teams as a “delivery” function instead of a strategic one. The high level thinkers come up with ideas, and the low level doers execute on those ideas. Ignored is the possibility that those closest to the work might be best equipped to make decisions about it. Escaping from this misguided mindset is a core goal of Agile thinking that SAFe fails to remotely accomplish. SAFe is oriented around volume, not value Why Scrum is killing your productAgile Scrum is not workingThe management strategy that saved Apollo 11Design Systems, Agile, and Industrialization agile
Be A (Re)Visitor An Article by Rob Walker robwalker.substack.com I was thinking about this not long ago while reading in Petapixel an essay by a photographer named Scott Reither, “Long Form Study: Why Photographers Should Repeatedly Revisit A Scene.” In it, he described photographing one particular stretch of beach, over and over, throughout his career. Of course that landscape has changed over time, and of course he’s had moments when he felt he’d captured the same territory so many times there was nothing left to see. But there was always something more to see — maybe because of a change in Reither’s life, rather than in the physical environment. seeingchangephotography