The other way to build a massive tech company - doing it slowly A Podcast by Howie Liu www.secretleaders.com I like to think about the early years of [Airtable] as not only a great time for us to be patient and to get a lot of details right in the product. I think some of those details had to be done in a slow, deliberate way with a small team. You can't necessarily parallelize the design and development of a really detail-oriented product. detailsproductsslowness
Muda, Muri, Mura An Article mag.toyota.co.uk Eliminating waste is the key to efficiency – in the Toyota Production System, this is termed as: Muda (waste), Muri (overburden), and Mura (irregularity). productionwastemanagementefficiency