The other way to build a massive tech company - doing it slowly A Podcast by Howie Liu www.secretleaders.com I like to think about the early years of [Airtable] as not only a great time for us to be patient and to get a lot of details right in the product. I think some of those details had to be done in a slow, deliberate way with a small team. You can't necessarily parallelize the design and development of a really detail-oriented product. detailsproductsslowness
Changing constraints The Constraints Keep Changing The explicit listing of known constraints in the design program helps here. The designer can periodically scan the list, asking, “Can this constraint now be removed because the world has changed? Can it be entirely circumvented by working outside the design space?” Frederick P. Brooks, Jr., What's Wrong With This Model? What's wrong with the rational model constraints