Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
Throughout a racing season there is constant, relentless pressure on the designer to keep making design improvements. But there is a limit to what can be achieved with any car design, before a jump has to be made to basically a new design, an innovation. As Gordon Murray says, ‘Given the situation and the pressure at any one time, you do get to the brick wall...I mean you're doing all these normal modifications, you know you can't go any quicker, you need to make the step forward.’
In the midst of the pressure, the fervour, the panic, he ‘used to get breakthroughs, I mean I used to get like suddenly a mental block's lifted.’