Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
It took two decades for HGTV and its ilk to streamline the process of creating design hegemony — to perfect the concept of having multiple shows congeal around the same aesthetic rather than let them exist at the whims of their individual hosts, as was more the case in the 2000s. While previous eras of design (think midcentury modernism) were spearheaded by architects, interior designers, and other tastemakers, in the late ’90s, capital-A Architecture lost interest in the home — deconstructivist ideas and new, high-tech forms were better suited to museums and universities — and a coalition of real estate developers, home improvement and furniture stores, and TV decorators stepped in to take their place. The worlds of high culture and popular consumption in residential design have never been more separate, and, in this critic’s opinion, both suffer as a result.