Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
What of machines and prefabrication? How do they compare?
Well, the machine has its limits. We, using handcrafted methods, do things that machines cannot do. Of course, it's not fast like a machine. And in complicated areas like here, things wouldn't go the same using a machine as it would by hand.
We use numerous variations of all these connecting and splicing joints. Using a machine, [the wood joints] can all be made uniform, but really, we need to consider whether that's a good thing. It's better to make each mechanism and joint by considering what's suitable for each unique condition.