Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
In the 1960s, the designer Robert Propst worked with the Herman Miller company to produce “The Action Office”, a stylish system of open-plan office furniture that allowed workers to sit, stand, move around and configure the space as they wished.
Propst then watched in horror as his ideas were corrupted into cheap modular dividers, and then to cubicle farms or, as Propst described them, “barren, rathole places”. Managers had squeezed the style and the space out of the action office, but above all they had squeezed the ability of workers to make choices about the place where they spent much of their waking lives.
...It should be easy for the office to provide a vastly superior working environment to the home, because it is designed and equipped with work in mind. Few people can afford the space for a well-designed, well-specified home office. Many are reduced to perching on a bed or coffee table. And yet at home, nobody will rearrange the posters on your wall, and nobody will sneer about your “dog pictures, or whatever”. That seems trivial, but it is not.