Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
If you're going to spend years working on something, you'd think it might be wise to spend at least a couple days considering different ideas, instead of going with the first that comes into your head. You'd think. But people don't. In fact, this is a constant problem when you're painting still lifes. You plonk down a bunch of stuff on a table, and maybe spend five or ten minutes rearranging it to look interesting. But you're so impatient to get started painting that ten minutes of rearranging feels very long. So you start painting. Three days later, having spent twenty hours staring at it, you're kicking yourself for having set up such an awkward and boring composition, but by then it's too late.