Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
The American lawn uses more resources than any other agricultural industry in the world. The American lawn could feed continents if people had more social responsibility.
Why should it be indecent to have anything useful in the front half of your property or around the house where people can see it? Why is it low-status to make that area productive? The condition is peculiar to the British landscaping ethic; what we are really looking at here is a miniature British country estate, designed for people who had servants. It has become a cultural status symbol to present a non-productive facade. The lawn and its shrubbery is a forcing of nature and landscape into a salute to wealth and power, and has not other purpose or function.
The only thing that such designs demonstrate is that power can force men and women to waste their energies in controlled, menial, and meaningless toil.