Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
The [Lake Erie] ecosystem underwent a series of changes, each of which were related. There was an increase in the human population; which led to higher phosophorus levels in the water; which led, at last, to an increased level of algae in the lake. In effect, Lake Erie’s ecosystem was rewritten. Changed by human activities into…something else.
But Franklin cites the study because it’s doing something slightly novel: applying Selye’s principle of stress to ecological systems, suggesting that they are, much like humans, just as susceptible to external stressors. And I’ve been thinking about that a lot lately, especially this week. Because Franklin’s suggesting that the work begins not by “fixing the system.” Rather, she suggests it’s about shifting the priority a little: to removing whatever stress you can.