Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
Does a concert hall ask to be next to an opera house? Can the two feed on one another? Will anybody ever visit them both, gluttonously, in a single evening, or even buy tickets from one after going to a performance in the other?
In Vienna, London, Paris, each of the performing arts has found its own place, because all are not mixed randomly. The only reason that these functions have all been brought together in Lincoln Center is that the concept of performing art links them to one another. The organization is born of the mania every simple-minded person has for putting things with the same name into the same basket.