Dan Mall
The Hot Potato Process
Building Momentum
An Article by Dan MallFight the Waterfall
Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
Rain Chains & Musical Drains
A rain chain in winter; Dresden Kunsthof Passage; Drainage planters near Pike Place Market in Seattle.
If there is a larger takeaway here perhaps it is about paths of least resistance, with regards to both the actual flow of water and design decisions. On the one hand, it is easy to blindly follow regional precedents and traditions with long histories (or grab whatever is handy at the hardware store). On the other hand, sometimes it makes sense to take a step back and decide consciously how to reveal (or conceal) a natural process.