Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
Picture a blind man probing his way with a cane. While he is alert to the feelings in the hand holding the cane, the crucial distinction may be defined by saying that these feelings are not watched in themselves, but that he watches something else by way of them, that is, by keeping aware of them. He has a subsidiary awareness of the feelings in his hand, feelings which are merged into a focal awareness at the end of the cane, constituting two kinds of awareness that are mutually exclusive — "from awareness" and "focal awareness".
There is here a particularly interesting phenomenal transformation. The sensations of the cane on his hand (the surface of the cane as it touches the palm of his hand, etc.) are lost. Instead, he feels the end of the cane as it touches an object...If our blind man shifts his attention from the tip of his cane to his hand, the meaning on the end of the cane disappears.