Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
Gordon Murray insists on keeping experience 'at the back of your mind, not the front' and to work from first principles when designing. For instance, in designing a component such as a suspension wishbone, 'it's all too easy - and the longer you're in design the easier it is - to say, I know all about wishbones, this is how it's going to look because that's what wishbones look like.' But if you want to make a step forward, if you're looking for ways of making it much better and much lighter, than you have to go right back to load path analysis. It is like designing things for the first time, rather than the nth time.