Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
The Lean Portfolio Management function that controls funding, are given sole authority to approve which Portfolio Epics move into each stream. Epics are not explanations about a problem that needs to be solved. They are pre-formed ideas about how best to solve those problems.
Right away we can see signs of the old-school mindset of viewing teams as a “delivery” function instead of a strategic one. The high level thinkers come up with ideas, and the low level doers execute on those ideas. Ignored is the possibility that those closest to the work might be best equipped to make decisions about it. Escaping from this misguided mindset is a core goal of Agile thinking that SAFe fails to remotely accomplish.
In all this focus on volume metrics, estimation, and churning work through the pipeline, the concept of what’s actually valuable or successful is easily lost. It’s often assumed that more work shipped out the door must be “value”, even if the experience of the product is actually suffering and users are not benefiting from the additional features.