Start all of the pieces of work a little bit earlier. The key to starting work early is not succumbing to the pressure of having to finish the work. Don’t worry about finishing. If you’re a developer, you can start doing things while your design or information architect are working because a lot of your work actually isn’t dependent on their work. Some of it is, so you probably won’t be able to finish, but that shouldn’t stop you from starting.
Share Work-in-Progress Early and Often
When you share work-in-progress, share it with the caveat that no feedback is needed at this point. You’re simply sharing it to let people know where you are. For example, if you have to make 12 wireframes, share it when you finish 2 or 3. Rather than spending a whole week to drop 12 wireframes, share 2 – 3 wireframes every 2 days. The more often you do this, you start to build rhythm, and rhythm builds momentum.
I recently read this interesting, and distressing, story of a man who was drugged and robbed. A form of crime which has been going on for centuries. But the 21st Century twist is that the thieves forced him to transfer large sums of money via his phone's banking apps.
While under the influence, the victim used his usernames, passwords, PINs, and biometrics to send money to the criminal's accounts.
Is there a "technological" way to stop this? His banks initially refused to refund the stolen money. Only once the press stepped in did they relent. One bank, Revolut, said:
This was an unusual case where the payments were authorised by the customer but, as is now clear, without his consent.