Why we stopped breaking down stories into tasks An Article by Adam Silver adamsilver.io The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint. But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this: Breaking down stories into tasks is time consuming The tasks we came up with invariably would change as we worked on the stories Tasks are repetitive Tasks were often carried out in parallel Our estimates didn't improve It decluttered our task board It encouraged collaboration throughout the sprint While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace. Why We Don't Do Daily Stand-Ups at Supercede agile
You need to make the step forward Throughout a racing season there is constant, relentless pressure on the designer to keep making design improvements. But there is a limit to what can be achieved with any car design, before a jump has to be made to basically a new design, an innovation. As Gordon Murray says, ‘Given the situation and the pressure at any one time, you do get to the brick wall...I mean you're doing all these normal modifications, you know you can't go any quicker, you need to make the step forward.’ In the midst of the pressure, the fervour, the panic, he ‘used to get breakthroughs, I mean I used to get like suddenly a mental block's lifted.’ Gordon Murray, Winning by Design: The Methods of Gordon Murray The Structure of Scientific RevolutionsMediocratopia progress