Why we stopped breaking down stories into tasks An Article by Adam Silver adamsilver.io The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint. But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this: Breaking down stories into tasks is time consuming The tasks we came up with invariably would change as we worked on the stories Tasks are repetitive Tasks were often carried out in parallel Our estimates didn't improve It decluttered our task board It encouraged collaboration throughout the sprint While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace. Why We Don't Do Daily Stand-Ups at Supercede agile
We feel it in our fingers In System A, there is no architect separate from the contractor. We are builders, simply. As builders, we have a direct feeling about construction. We feel it in our fingers, so it is down to earth. One result of this down-to-earth quality is that everything is somewhat experimental. We make experiments all the time. Sometimes we place a piece of wood this way. Another time, we may like to try it that way. Any time something new comes up in the design of a building, we are very likely to try and invent the best way of building it. This is not a great big invention. Just a simple invention, the way we might invent a way of tying a piece of string, to hold a broken toy together. It is just practical. Christopher Alexander, The Battle for the Life and Beauty of the Earth In Defence of Intuition inventioncreativityproblems