Why we stopped breaking down stories into tasks An Article by Adam Silver adamsilver.io The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint. But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this: Breaking down stories into tasks is time consuming The tasks we came up with invariably would change as we worked on the stories Tasks are repetitive Tasks were often carried out in parallel Our estimates didn't improve It decluttered our task board It encouraged collaboration throughout the sprint While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace. Why We Don't Do Daily Stand-Ups at Supercede agile
Waking up from the dream of UX An Article by Peter Merholz www.petermerholz.com In no objective sense were things better for UX [in 2010]. Most companies didn’t know it existed. Most who did, drastically underinvested in it. Those who were willing to invest in it were savvy enough to listen to thought leaders, but that was a paltry percentage of the real work to be done. What’s happened by 2021 is that UX is not interesting in and of itself anymore. UX is a given. As Joe Lamantia said in a mailing list I’m on, “it’s furniture.” And the challenges and frustrations people are expressing are largely due to this maturation. We’re moving from “the dream of UX” to “the reality of UX.” Why I'm losing faith in UXUndoing the Toxic Dogmatism of Digital Design ux