Why we stopped breaking down stories into tasks An Article by Adam Silver adamsilver.io The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint. But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this: Breaking down stories into tasks is time consuming The tasks we came up with invariably would change as we worked on the stories Tasks are repetitive Tasks were often carried out in parallel Our estimates didn't improve It decluttered our task board It encouraged collaboration throughout the sprint While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace. Why We Don't Do Daily Stand-Ups at Supercede agile
The source code for SimCity Local Code was Sorkin’s attempt to design a whole city from scratch—with one big twist. The whole thing had been written as if it were the byzantine, nearly impossible to follow codes and regulations for an entire, hypothetical metropolis. The effect is like stumbling upon the source code for SimCity. Sorkin’s exhaustively made point was that, if you know everything about a given metropolis, from its plumbing standards to its parking requirements, its sewer capacity to the borders of its school districts, then you could more or less accurately imagine the future form of that city from the ground up. Geoff Manaugh, A Burglar's Guide to the City Local Code: The Constitution of a City at 42º N Latitude rulesregulations