Why we stopped breaking down stories into tasks An Article by Adam Silver adamsilver.io The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint. But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this: Breaking down stories into tasks is time consuming The tasks we came up with invariably would change as we worked on the stories Tasks are repetitive Tasks were often carried out in parallel Our estimates didn't improve It decluttered our task board It encouraged collaboration throughout the sprint While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace. Why We Don't Do Daily Stand-Ups at Supercede agile
Rain Chains & Musical Drains Show image 0 Show image 1 Show image 2 A rain chain in winter; Dresden Kunsthof Passage; Drainage planters near Pike Place Market in Seattle. If there is a larger takeaway here perhaps it is about paths of least resistance, with regards to both the actual flow of water and design decisions. On the one hand, it is easy to blindly follow regional precedents and traditions with long histories (or grab whatever is handy at the hardware store). On the other hand, sometimes it makes sense to take a step back and decide consciously how to reveal (or conceal) a natural process. Roman Mars & Kurt Kohlstedt, 99% Invisible 99percentinvisible.org Rain chains waterarchitecturedetailspatterns