Why we stopped breaking down stories into tasks An Article by Adam Silver adamsilver.io The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint. But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this: Breaking down stories into tasks is time consuming The tasks we came up with invariably would change as we worked on the stories Tasks are repetitive Tasks were often carried out in parallel Our estimates didn't improve It decluttered our task board It encouraged collaboration throughout the sprint While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace. Why We Don't Do Daily Stand-Ups at Supercede agile
Drawing pictures of cities An Article by Noah Smith noahpinion.substack.com This is a famous picture by the artist Imperial Boy (帝国少年), who works in the anime industry. I sometimes claim that the entire genre of solarpunk is simply a riff on this picture. If it’s not just “trees on buildings”, where does the Imperial Boy picture get its magic? Looking at it carefully and trying to analyze what I like about it, I think that much of it is about architecture, and even more of it is about the use of urban space — about how the structures in the picture shape the kinds of things you’d do if you were there. For example, here are five things I like: Open, walkable multi-level retail River with low bank Walkable streets Varied architecture Shade 251. Different ChairsSuburban NationTowers in the Village urbanismpatternsstreets