Why we stopped breaking down stories into tasks An Article by Adam Silver adamsilver.io The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint. But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this: Breaking down stories into tasks is time consuming The tasks we came up with invariably would change as we worked on the stories Tasks are repetitive Tasks were often carried out in parallel Our estimates didn't improve It decluttered our task board It encouraged collaboration throughout the sprint While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace. Why We Don't Do Daily Stand-Ups at Supercede agile
Deciding what to design We Don’t Really Know the Goal When We Start The most serious model shortcoming is that the designer often has a vague, incompletely specified goal, or primary objective. In such cases, the hardest part of design is deciding what to design. I came to realize that the most useful service I was performing for my client was helping him decide what he really wanted. Today, we recognize that rapid prototyping is an essential tool for formulating precise requirements. Not only is the design process iterative; the design-goal-setting process is itself iterative. Knowing complete product requirements up front is a quite rare exception, not the norm. Therefore, goal iteration must be considered an inherent part of the design process. Frederick P. Brooks, Jr., What's Wrong With This Model? What's wrong with the rational model iteration