Why we stopped breaking down stories into tasks An Article by Adam Silver adamsilver.io The Scrum process says to break down stories into tasks to make estimation easier, encourage collaboration and to be able to show more granular progress during a sprint. But after a few sprints, we decided to do the next sprint without creating tasks. As a result we drastically increased our velocity and never went back. Here I'll jot down some of the reasons we decided to do this: Breaking down stories into tasks is time consuming The tasks we came up with invariably would change as we worked on the stories Tasks are repetitive Tasks were often carried out in parallel Our estimates didn't improve It decluttered our task board It encouraged collaboration throughout the sprint While we started our process by following Scrum to the letter, we soon realised that breaking down stories into tasks was something that wasn’t worthwhile for us. In the end we realised that it was overplanning and poor use of our time. In the end we used that time to get on with the work and deliver at a significantly faster pace. Why We Don't Do Daily Stand-Ups at Supercede agile
A hypothesis is a liability A Research Paper by Itai Yanai & Martin Lercher genomebiology.biomedcentral.com There is a hidden cost to having a hypothesis. It arises from the relationship between night science and day science, the two very distinct modes of activity in which scientific ideas are generated and tested, respectively [1, 2]. With a hypothesis in hand, the impressive strengths of day science are unleashed, guiding us in designing tests, estimating parameters, and throwing out the hypothesis if it fails the tests. But when we analyze the results of an experiment, our mental focus on a specific hypothesis can prevent us from exploring other aspects of the data, effectively blinding us to new ideas. researchsciencediscovery